We’re proud to announce that Vision Infrastructure Pvt. Ltd. has been awarded the contract for the Sona Khola Hydropower Project – 9 MW located in Eastern Nepal. This milestone reinforces our commitment to sustainable energy and national infrastructure development.
Our team will begin preliminary site assessment and mobilization this month. We look forward to delivering this project with the same excellence, innovation, and environmental focus that define Vision Infrastructure.
Stay tuned for progress updates!
Date:2081.12.31 to 2083.12.30
Email: vision.viplco@gmail.com
At Vision Infrastructure Pvt. Ltd., we believe the right tools are the backbone of successful project execution. From modern office hardware to field-grade machinery, our resources enable us to deliver precision, speed, and efficiency across every construction milestone.
Â
Our office is equipped with modern tools and technology to ensure seamless communication, efficient planning, and reliable documentation. These resources help our team operate at peak productivity while maintaining the highest standards in project execution and client service.
| S.N. | Particular | Quantity | Remarks |
|---|---|---|---|
| 1 | Laptop Dell | 6 | |
| 2 | Cannon Printer A4 | 3 | |
| 3 | File Daraz | 4 | |
| 4 | File Rack | 2 | |
| 5 | Office Table | 7 | |
| 6 | Office Chair | 15 | |
| 7 | Telephone set | 6 | |
| 8 | Photocopy (4 in 1) A4 | 1 |
We deploy a wide range of heavy-duty construction machinery and specialized equipment to support complex hydropower, road, and building projects. Each asset in our fleet is maintained for performance, safety, and precision—enabling us to deliver results on time, every time.
| S.N. | Name | QTY | Capacity | Remarks |
|---|---|---|---|---|
| 1 | Rock Breaker | 2 | Open Type | AXM, EDT |
| 2 | Excavator | 3 | 23 Ton | 2 pcs- Kobelco- SK220XDLC 1 pcs-Hyundai 220 LS |
| 3 | Tractor | 1 | John Deer | |
| 4 | Tipper | 1 | Tata SK 1613 | |
| 5 | Bolero Picup | 1 | Mahindra Bolero 4 WD. | |
| 6 | Backhoe Loader | 1 | CASE 851EX | |
| 7 | Concrete Mixer | 2 | Mixture with Lifting | |
| 8 | Crusher Plant | 1 | 30 TPH | 30 ton per hour capacity |
| 9 | Water Pump | 3 | ||
| 10 | Wood Cutter | 2 | ||
| 11 | Steel Bar Cutter | 2 | ||
| 12 | Steel Driler | 2 | ||
| 13 | Welding Machine | 2 | ||
| 14 | Disel Generators (DG) | 2 | 1 Pcs- 30KV Jakson Company 1 Pcs-125KV Jakson Company | |
| 15 | Circular Saw | 1 | ||
| 16 | Air Compressor | 1 | ||
| 17 | Jack Hammers | 2 | ||
| 18 | Monkey Jumper | 1 | ||
| 19 | Total Station | 1 | Survey set all | |
| 20 | Disel Storage Tank | 1 | 12,000 Liter capacity | |
| 21 | Disel storage/carrying drum | 60 | 220 Lit. each | 13,20 Liter capacity |
| 22 | Scaffolding & shuttering, engineering play wood |
Vision Infrastructure Pvt. Ltd. is a certified construction company established in 2022 A.D. (2078 B.S.) and located in Thapagaun, Kathmandu-10, Nepal. Built by a team of passionate engineers, skilled technicians, and experienced professionals, we specialize in hydropower, road, and building construction, with a strong emphasis on sustainability and innovation.
VAT No.: 610253027
Company Registration No.: 287670/078/079
© 2025 Vision Infrastructure Pvt. Ltd. All rights reserved. Developed by Protozoa Host.